C10: Package, hand over, review AI readiness (coach)
- Scope
- Team
- Time box
- 60 min
All coach pagesStudent pageSource on GitHub
C10 is a synthesis challenge — review for honesty and completeness rather than a single technical answer.
Expected evidence
Timing cues: by 30 minutes, the asset and handover-and-ai-review.md should be drafted; reserve the final 15 minutes for committing and preparing the 5-minute showcase.
- One reusable asset (the archetype adaptation, the modernization playbook and plan, or the C9 perf kit fixes), copied into
factory/evidence/c10/reusable-asset/in the team/pod lead’s repository onmain, with a shortREADME.mdusable by someone who wasn’t in the room. A README pointing to a fixed commit is also acceptable if the next team has confirmed access and the source repository will be retained. factory/evidence/c10/handover-and-ai-review.mdcommitted once in the team/pod lead’s repository onmain(and shared in the team channel), covering:- Every team member’s C8
acceptance.jsonverdict (ACCEPT), C8 live check results, and C9 Query StorebaselinevsafterCPU/duration improvement. - The AI-readiness gap register, with an entry each time a human or coach had to step in (including any lifeline used, plus the human review gates in C3, C5, C6 and C7).
- The 5-minute showcase talking points.
- Every team member’s C8
Model answer
A credible AI-readiness gap register entry for a team that used no lifelines:
Challenge / area: C7, the cutover go/no-go decision. Where a human had to step in: confirming replication lag was actually zero and source writes had actually stopped before cutting over. Why the agent could not complete it alone: a wrong cutover risks data loss, and no automated check in the kit makes this call for you. Next step for customer engagements: keep migration cutover as an explicit human-approved gate even in automated pipelines.
A reusable asset that passes the bar: the adapted archetype folder or the five C9 .sql fix scripts, copied into factory/evidence/c10/reusable-asset/ or referenced at a fixed commit with confirmed access and retention, with a short README.md explaining what subscription/tenant or database values a new team supplies.
Business outcome check
The outcome is a documented path to AI. Open handover-and-ai-review.md and check that each AI-readiness gap has a clear reason and next step for customer engagements.
Common mistakes
- An empty or token AI-readiness gap register (“we didn’t need any help”) — review C3–C7 with the team; every team has at least the deliberate human-in-the-loop review gates above, even with a perfect run.
- A “reusable asset” that has no
README.mdexplaining what inputs to supply. - Handover summary table covering only the team lead’s C8/C9 results, missing the rest of the team.
- Running out of time and skipping the showcase entirely — even a brief verbal walkthrough with one screen shown counts.
Reset
Not applicable — C10 is a documentation and synthesis challenge.