Ten challenges take Contoso University from a Windows VM in its own datacenter to a modernized app on Azure. Work through them in order, checking your results as you go. Ask a coach for help with blockers or the handover; C7’s cutover decision requires a coach.
The challenges
Section titled “The challenges”Day 1 08:30 kickoff
- C1: Define the opportunityTeam · 45 minAll six, in order
- C2: Secure, AI-ready foundationMember · 45 minSecure by default
- C3: Assess the sourceMember · 60 minSafe, repeatable change
- C4: Choose target statesTeam · 45 minCurrent platform
- C5: Deploy the CoE archetype with APEXMember · 90 minRepeatable provisioning
- C6: Modernize with GitHub CopilotMember · 180 min across both daysCurrent platformStarts at 14:45. SQL Managed Instance provisioning runs in the background.
Day 2 08:30 reconnect
08:30: Check both VMs and the Graph grant. Start the MI link (C7 requirements 1 and 2).
09:00: Resume C6 while the database seeds. Return to C7 at 10:30.
- C7: Migrate and go liveMember · 120 min including early setupSafe, repeatable change
- C8: Validate the patternMember · 45 minSecure by default
- C9: Optimize the DB with GitHub CopilotMember · 60 minReliable at enrollment peaks
- C10: Package, hand over, review AI readinessTeam · 60 minDocumented path to AI
10 challenges · 750 min total effort
Time boxes are pacing, not hard stops. See the event overview for the full timetable, including breaks and the showcase.
The scenario
Section titled “The scenario”Contoso University is a fictional public university. Its student enrollment app is old, patched by hand and holds its database password in a file. Your team is the delivery team of the partner the university hired to modernize it. The customer story tells it in one page and names the four people you work for.
How the challenges work
Section titled “How the challenges work”- Team and member challenges. Team challenges (C1, C4 and C10) are done together on one shared screen and committed once in the team/pod lead’s repository (
C:\src\<your-repo>onmain), then shared in the team channel. Member challenges (C2, C3 and C5 to C9) are done by each person in their own repository (C:\src\<your-repo>onmain) and subscription onvm-dev01. - Five parts on every page. Background says why it matters and which business outcome it serves. Challenge gives the starting point, what the kit fixes and what you decide. Requirements say what you must do. Success criteria let you check your results. References link to Microsoft Learn.
- Hints are folded away. Open them when you are stuck. Where a challenge leaves a choice to you (C1, C4 and C10), there is no single right answer, and your coach looks at your reasoning.
- Working artifacts live in
factory/evidence/.Import-Kit.ps1pre-populates the working templates onmain.
Ground rules
Section titled “Ground rules”- Work as a team. The team lead is also a member. For team documents (C1, C4, C10), the team/pod lead commits the file once on
mainand shares it in the team channel. - Let Copilot do the work and keep a person in charge. Read what it produced and run the check before you commit.
- If a step fails twice, ask your coach.
- Never put tenant, subscription or object IDs, or a password, in anything you commit.
Before C1: 30-minute hackathon introduction
Section titled “Before C1: 30-minute hackathon introduction”Day one opens at 08:30 with a 30-minute PowerPoint presentation by the tech lead before any team starts C1. The briefing covers:
- How the hackathon works: the two-day schedule, team and member scopes, and working artifacts on
vm-dev01. - The Contoso University scenario: who the university is, the four leaders you work for (Dana, Priya, Marcus and Tomás), the problems that triggered this engagement and the six business outcomes they need.
- The ten challenges end to end: how business outcomes (C1) and platform guardrails (C2) connect to source assessment (C3), target-state decisions (C4), CoE archetype provisioning (C5), app modernization and cutover (C6 and C7), acceptance testing and database tuning (C8 and C9), and the final handover review (C10).
Before you start
Section titled “Before you start”Before day one, complete the setup for your event:
- Path A: Follow Datacenter and workstation before the team lead runs vending.
- Path B: After the team lead completes vending, follow Student onboarding.
The pre-event timeline covers the member gates (T-14 and T-3) and the team lead’s foundation (T-7) and vending (T-1). During the event, review progress at the end of each day.
Track your progress
Section titled “Track your progress”On a challenge page, tick Done on each requirement as you finish it and tick the Success criteria checkboxes as you complete each check. The bar shows requirements completed and jumps to each one. Ticks stay in this browser only; they aren’t shared, and clearing site data or changing browsers starts from zero. Reset, then Confirm reset within four seconds, clears this page’s ticks.
Where to go next
Section titled “Where to go next”Start with C1: Define the opportunity after completing the pre-hackathon setup (Steps 1 to 4).